|
|
 |
 |
| ¡¡ |
 |
| ¡¡ |
|
|
| ¡¡ |
|
|
|
|
| ¡¡ |
|
¡¡ |
¡¡ |
¡¡ |
|
|
| ¡¡ |
|
1kV Cold Shrink Cable Termination and
Straight Joints |
Home
< Silicon rubber precast |
|
 |
|
 |
  |
¡¡ |
|
|
Cold Shrink Cable Termination and Straight Joints Summary |
|
Cold Shrink Cable Termination and Straight Joints is
suitable for the
end of cable
dealing and
intermediate
link
of 1kv.The products are classified into double cores, three
cores, four
cores five cores
etc.
|
|
|
|
Specification |
|
Name
|
Type
|
Section
|
Name
|
Type
|
Section
|
|
Indoor cold
shrinkage
two-core termination |
LS-1/2.0
|
10-16
|
Intermediate cold
shrinkable
double-core joints
|
JLS-1/2.0
|
10-16
|
|
LS-1/2.1
|
25-50
|
JLS-1/2.1
|
25-50
|
|
LS-1/2.2
|
70-120
|
JLS-1/2.2
|
70-120
|
|
LS-1/2.3
|
150-240
|
JLS-1/2.3
|
150-240
|
|
LS-1/2.4
|
300-500
|
JLS-1/2.4
|
300-500
|
|
Indoor cold
shrinkage
three-core termination |
LS-1/3.0
|
10-16
|
Intermediate
cold shrinkable
three-core joints |
JLS-1/3.0
|
10-16
|
|
LS-1/3.1
|
25-50
|
JLS-1/3.1
|
25-50
|
|
LS-1/3.2
|
70-120
|
JLS-1/3.2
|
70-120
|
|
LS-1/3.3
|
150-240
|
JLS-1/3.3
|
150-240
|
|
LS-1/3.4
|
300-500
|
JLS-1/3.4
|
300-500
|
|
Indoor cold
shrinkage
four-core termination |
LS-1/4.0
|
10-16
|
Intermediate
cold shrinkable
four-core joints |
JLS-1/4.0
|
10-16
|
|
LS-1/4.1
|
25-50
|
JLS-1/4.1
|
25-50
|
|
LS-1/4.2
|
70-120
|
JLS-1/4.2
|
70-120
|
|
LS-1/4.3
|
150-240
|
JLS-1/4.3
|
150-240
|
|
LS-1/4.4
|
300-500
|
JLS-1/4.4
|
300-500
|
|
Indoor cold
shrinkage
five-core termination |
LS-1/5.0
|
10-16
|
Intermediate
cold shrinkable
five-core joints |
JLS-1/5.0
|
10-16
|
|
LS-1/5.1
|
25-50
|
JLS-1/5.1
|
25-50
|
|
LS-1/5.2
|
70-120
|
JLS-1/5.2
|
70-120
|
|
LS-1/5.3
|
150-240
|
JLS-1/5.3
|
150-240
|
|
LS-1/5.4
|
300-500
|
JLS-1/5.4
|
300-500
|
|
|
Product technical
index |
|
Item
|
¡¡
|
Test item
|
standard
requirement
|
Result
|
Note
|
|
1kv outdoor-indoor
terminal and
intermediate joint |
1
|
1min withstand
voltage test
|
4kv£¨indoor terminal£©
4kv £¨outdoor
terminal£©
No flashover, no
breakdown |
4kv/1min
No flashover, no
breakdown
|
¡¡
pass |
|
2
|
load
cycle test |
5h to heat£¬ 3h
to
cool£¬ conductor's
temperature is
75¡æ in heating
|
same as left
|
pass
|
|
3
|
4h withstand
voltage test
|
2.4kv no flashover
no breakdown |
2.4kv no flashover
,no breakdown
|
pass |
¡¡ |
|
|
 |
|
|
|
| ¡¡ |
|
¡¡ |
|